June 24, 2010
Integrity Building Corp Attn: Eric Hoffman
1150 N. Country Club Dr. #8
Mesa, AZ 85201 Re: Thunderbird Internal Medicine
This letter is written in acceptance to provide fire damper support for fourth side of fire
damper (side between supply and return duct) to structural member at roof in lieu of fire
rated lid. All other sides of fire damper are secured to rated lid as identified on the
manufacturer's installation detail. This installation meets the intent to have a breakaway
duct section in case of fire that will enable the fire damper to remain intact and in its
original location for the minimum time required for the fire rating of the lid.
Should you have any additional questions or need clarification please feel free to contact
our office.
Sincerely,
Justin C. Grimmett, CPD, LEED AP
MECHANICAL DESIGNS, INC.
39554
i SCOTT A.
•cARLSO
due,
Expires:9/3p/ly
7227 N. 16th Street, Suite#200 Phoenix, AZ 85020 602.943.6608 FAX 602.943.6181
��GHAN/cq
l
�������
•• MDR� • Consulting Engineers
__
0FSiGNS, `,C,
May 24, 2010
BCMA Architecture P.C. Attn: Brian Moore
322 West Knight Lane
Tempe, AZ 85284
Email: Brian@bcmaarch.com Project: THUNDERBIRD INTERNAL
MEDICINE
This letter is written in acceptance to utilize schedule 40 PVC/ABS in lieu of cast iron for the
drain, waste & vent system as specified by the original plumbing drawings.
Sincerely,
fir!/,
Y 1 '
Justin Grimmett, CPD, LEED AP
MECHANICAL DESIGNS, INC.
Emailed: 5/24/2010'**Original mailed upon request.
ts:—;74,0 . 47:4,11
,,,,•/./104,*4,7",4;:
1 39v54 s
SCOJTT A. `" `
�d o CARLSCN
814,., .(' /
Exp;r s• 9/30/11
7227 N. 16th Street, Suite#200 Phoenix, AZ 85020 602.943.6608 FAX 602.943.6181
SMOKE DETECTOR INSPECTIONmow
s
.n.e►ec
Systems Commissioning & Testing, Inc.
820 E.47th St.,Suite B-15B,Tucson,AZ 85713 (520) 884-4792 FAX(520)884-4923
Allen F.Kent Jr.,T.B.E. Toll Free: (866)334-7119 AZ ROC License#081448 L-39
Associated Air Balance Council
AABC
PROJECT:T WPE D I NTRNM11. MIMIC,WE PAGE: P-1
ADDRESS:SbZO U .-fytwppitgtitA Rp s1 C P G,LaAtitEl1rzDATE: 70!Zol0
PERMIT: 5-W 28 BY:Du STY Fict>
Smoke detectors have been inspected per the tasks listed. Exceptions to a passing condition are identified
with a numbered note. Performance testes results are for equipment function on date tested. If the building
owner or any representative of the building owner observes or believes a deficiency is present, modifications
have been made,or six months have passed since this testing, the system must be reinspected and retested.
MANUFACTURER: {-I -PROPCIG15 1'rIIJD v j .Oc MODEL:SL-2000 11/
UNIT DUCT SAMPLE RATED TEST FAN ALARM ALARM ALARM
AND SIZE TUBE A P"WC A P SHUT VISUAL AUDIBLE FIRE
LOCATION W x H LENGTH MIN--*MAX "WC DOWN PANEL
1}c 1 P-er+tr- 1 Z�"X13 to`t Oa"-(.Z" 049 it )< X X N��4
INSPECTION TASKS (AS APPLICABLE)
DELTA PRESSURE: As measured across the detector sampling tubes.
FAN SHUT DOWN: Tested for immediate shut down when detector is challenged with canned smoke.
Fan shut down is OLiOBr4L,or STAND ALONE.
VISUAL ALARM: Lighting of remote test/indicator unit(not required if detector is visible from floor.)
AUDIBLE ALARM: Sounding of remote test/indicator unit(not required in all municipalities.)
FIRE PANEL: Alarm reports to central fire panel(remote test/indicator unit not then required.)
•NOTES: 'rtt;-r
0
Systems Commissioning & Testing, Inc.
820 E.47th St., Suite B-15B,Tucson,AZ 85713 (520) 884-4792 FAX (520) 884-4923
Allen F. Kent Jr.,T.B.E. Toll Free: (866)334-7119 AZ ROC License
#081448 L-39
Associated Air Balance Council
AABC
OUTSIDE AIR FLOW VERIFICATION
DATE: 7/2/to 17 INSPECTOR:PAiTy rIEwr44 PAGE: 1 OF I
PROJECTT41gP I140-All. OfeDICIIVC TIME OF TEST: START 1 n. oD FINISH 1I 30
ADDRESS: S10ZO W. niuPpasi) AD STE &AT1C.t / 'L
CONTRACTOR: S46.A AID r�h� BLDG PERMIT#: 510428
UNIT MODEL# MANUFACTURER DESIGN OA OA MAKE INTAKE TEST OA SUPPLY AIR FAN RPM
TOTAL FREE AREA VELOCITY TOTAL TEST
FPM TOTAL
14G1 AHSOlootf CAM 64 326". d.g3Pr2 Ltos 33s-- Zv&o 1381
WE HAVE TESTED AND BALANCED THE OUTSIDE AIR FLOWS FOR THE HVAC EQUIPMENT AT
THE ABOVE REFERENCED PROJECT IN ACCORDANCE WITH 2003 UMC WITH COP
AMENDMENTS FOR"VENTILATION OUTSIDE AIR INTAKE CERTIFICATION".THE FINAL
RESULTS OF THIS INSPECTION ARE RECORDED ABOVE.
NOTES:
Systems Commissioning&Testing,Inc. AABC CERTIFIED
HEAT PUMP PACKAGE UNIT TEST
PAGE:
PROJECT: `l-kt.A DP-P.611LO forcle '."V' MFDtG(.. DATE: 7J7-/1 t7
SYSTEM
MANUFACTURER &It wi F-ee
MODEL NUMBER e s()te
SERIAL NUMBER )(vc
EQUIPMENT LOCATION gooF
AREA SERVED ZOO—Zj 8
CONDITIONS REQUIRED FINAL REQUIRED FINAL
TOTAL CFM 20 00 Z0e0
OUTSIDE AIR CFM 325- 33c Qr
EXTERNAL STATIC PRESSURE 0 SO'
FAN IN / OUT Athk, O,?3p
DX COIL IN / OUT /1/
FILTER IN / OUT
SYSTEM VOLTAGE 00514
EVAPORATIVE MOTOR HP [ovum vo-ru it
EVAPORATIVE MOTOR RPM C7i [7 O,p
EVAPORATIVE MOTOR AMP 5 -<{,33-4-'I
COMPRESSOR AMP 1 5-,
CONDENSER AMP I I-
FAN RPM 13e
OUTSIDE AIR DB/WB /0D ° ° °
COOLING TEMPERATURE EAT LAT EAT LAT
DRY BULB 7 T ° S-Z ° ° °
WET BULB ° C.f f 0
HEATING TEMP(DB ONLY) 7(P ° /Q t ° 0 , 0
MOTOR SHEAVE U pt-{i -4 578 r'
FAN SHEAVE s
BELTS CENTER TO CENTER 4143 3 I /y,71-41
NOTES:
aillf*.=.1.222-3=_ � E = 33rep- ,
Systems Commissioning&Testing, Inc. AABC CERTIFIED
TERMINAL DEVICE SHEET
PROJECT: THu NU FM M F-A (NW- kL ',AEI)! A tVC PAGE: Z
SYSTEM: (0 rtt, IA to rt-- DATE: 7/i/)o
ROOM NO. TERMINAL AK REQUIRED PRELIMINARY f FINAL NOTES
NO SIZE FPM CFM FPM CFM FfICI CFM
Z0i0 1 I2"L ( .Oa `too 3tno 37s
Zo7 2 g"cP zoo 'LSp 220
ZoS" 3 \L 20,9 26-5- Z t S
Zoo ''.l 11"G Lf00 `(I S �f3D
fg S loft 7S 70 70
CIO a rot. IZ5- !eS" [3 C
Zo S 7 1 oV i.52 3Cs
22� pc 23-
2,01 1 0 '4) f V j 2 .�r jk.9
( A PpL�l t cot -- � f o(9o) kai25) (2-oec)
2,0 \ I o''d2 1,Z1a 'loch Z30 ZRW ZW Zao
Zoe z e''cp \ cis_ 17.0 as Ito
(2‘0 3 1-i"CP 2.-76— 3�5 Z6,o 330
.0,1 q l0'0 Ho 11S 13 S 170
Zo S c {3'`0 , S 1 D t i c
204 b 1 b'0 230 Zao ZZo
Zoo 7 I Z' l) tu_ 3 qbo Li5b
PilC err,, << i-oz_ (jos-) Cio03, Ci-Ne)
NOTES: