HomeMy WebLinkAbout163289 Glendale
ARIZONA
• M arch17, 2024
SENT VIA E-MAIL ONLY
Jason:Morris: .
Withey Morris Baugh, PLC. = .
• 2523 E:Arizona Biltmore Circle, Suite A-212 : -
Phoenix, AZ 85016 . : :
stephaniewmbattorneys.com : .
RE: Pre-Application Review fora Rezone of the property location at
the SEC of 91st Avenue and Cardinals Way
: Dear Applicant:
The:City's Development Review.Team has completed the initial review of your.
pre- application materials and offers the atttached draft.comments for your use.
As per our:discussion.on March 1.4; 2024, you will:'be creating a new PAD to
. replace the previous PAD:
: Let me:know if you have any questions.
Sincerely, -
Christina LaVelle, •
Senior Planner
: City of Glendale Development Services Division
1
::PHN 623-930-2553
E:::clavelle(a�glendaleaz:com:
Team Pre-Application Meeting;
• SR24-0102
Applicant: Jason Morris.
Te
am Pre-Application Meeting: Thursday, March•14, 2024 @
11:00 am
Request:: PAD Amendment
• Size: 63.7.1 acres
• General Plan LU Designation: Regional Mixed Use
Zoning Classification::PAD:(Planned Area Development)
• • Council District: Yucca,"Joyce Clark
: .Project Details:
The applicant is requesting to create a new PAD-to replace the Glendale :. -
303 Planned Area Development:
• Submittal.Process. . .
A.
Rezone: Rezone Application for a new PAD: Please review Section . :: :
35.6.207 of the City of Glendale Unified:Development:Code (UDC).
for:specifics on the application process.
B. Design Review: per section_35.6.212 is required. Review of the first
submittal requires 7.weeks; and 3 weeks for each additional
submittal..Please address the attached comments imyOur submittal.
C. Building Permits: Typical review:time is.15 business days.
• Concurrent ''.at-risk submittals may be allowed if you obtain written
permission of the Building Official. Permit cost is related to the
valuation of the improvements, number of plan sheets, any
associatedimpact fees, etc: . .. : . • : •
'
D. Planning Submittals: Please note,:Staff•is now requiring electronic:: .
submittals. Planning &Zoning - City of Glendale
:21P`age
(gle.ndaleaz:com)Halfway`down:the.page, you'll.see:a:brownish
button that says, "Submit Here". Click on the button and it will
promptly ask you for the password. Password: 5850PIanning.
PRE-APPLICATION REVIEW COMMENTS
Please note that these comments are.preliminary and based.On the proposed
pre=application. Additional comments May be made and provided at formal
design:review.. -These:are draft comment*and:final comments will be
provided following the team pre-application meeting.
• Planning - Christina LaVelle (623)930-2553-clavellea.glendaleaz.com •
1. Please include within your PAD :
a.: :•PAD::Narrative: It is critical to update the PAD narrative to reflect :
: not:only the changes that the proposal is addressing:but to clean up
language that refers to:the.previous,code:to reflect:the.intent of the
Unified Development Code The following are high level:comments
regarding some changes that will need to be:made to the:PAD
Narrative: :
i. Introduction: The Glendale 303 PAD includes 105:55 acres
Wi
th a parcel that is not included: Please either include:all of
the acreage'within the request or you will need to develop a
new PAD:. . .
ii:: :General Plan:(Page 5-8.): Please: update General Plan goals
to reflect the uses that are now excluded:and those that are.
proposed.; ...
Permitted Uses` Provide a list of all•permitted uses..
• iv: Uses Subject to a Conditional Use Permit (Page9)::
Again, include a'table that outlines the-uses that would be
allowed with a conditional use permit. •
v.. .Accessory Uses: include a table that outlines the uses that
would be allowed an accessory use: (Include setbacks and
heights in development standards) (Section 35.3.200) .
•
vi. Temporary Uses include a table that:outlines the uses that.
: would be:allowed as temporary use. (See Section_35.2.300)
vii. : Development Standards:Please do not refer to a specific
section (set:forth in C-2): Provide specifics on the
development standards for each type of use (Industrial and
311) ge
Co
mmercial). removing. .• - :
ercial). Please:consider the FAR limitation
and i nstead using lot coverage by structure.
Performance Standards:: Please note the established
development plan. Please include an exhibit:
i x. : Design Review::Please update that design:review is
required and outlined in Section 35,6:212..Please include -
exhibits that show renderings,, colors and materials, walls,
x Park
ing Regulations/:Loading: Please:provide your:
proposed parking regulations. Please include the size of
parking spaces and if applicable the:calculation of parking . •
spaces:. . _ .. .
xis :Landscape and Screening: Provide:.details on screening: :
- xii. •Circulation: Please include how the circulation will be dealt
With
on this site and throughout �. •
Signage :I would suggest reviewing the sign section (Page
16)to determine if.this reflects your.Si na e.needs: It.ma
9 g may
be beneficial to provide an exhibit for a comprehensive sign
• plan to create cohesive design guidelines for the site:
. • xiv. Architectural.D.esign: Please:describe your-Please provide
: conceptual building elevations and/or renderings. :
xv: Exhibits: Provide exhibits
. b: Prop 207 :
C. Legal Description and Record of Survey
d. Copy of Deed .
e. Site Plan
• : ..f. . :Elevations
g: .Landscape Plan
2 Citizen Participation Plan:
• . a: Citizen Participation Plan Narrative and Final Report Please review
Section 35.6.202C for the UDC for Requirements: .
- b. :Please note that you will need to have a notification for your
neighborhood meeting, Planning Commission.Meeting and.City
Council Meeting. .
c: :Neighborhood Letter and Meeting •
I: To enhance notification of required neighborhood meetings
you shall not only send letters of notification to:interested
parties, staff, neighbors and elected officials,you shall post
the site at least:10 days prior to:the:meeting with.signs. -
. 1: Details on.the Sign Requirements will be provided in. `
your packet that will be received by admin at the time
• of submittal.
:4LPage
- 2. ` Please be aware that you will need to provide a
'separate sign for the meeting. The requirements for
said::sign will be included,in your packet.
ii. Please be aware, that the minimum notification area has •
changed and will be a minimum of a 600-foot radius from the
property lines..If the.zoning or land use request results in the •
change to an existing roadway classification, alignment or
you will be required to install a traffic signal, the notification: .
= will increase by 30%. In addition, regardless of whether the
• notification area touches a County property, they will be.
included on the list. If the:notification area touches a
subdivision, the entire subdivision will be included in this list.
Any additional properties as deemed to be part of this list will
be provided a:QR Coded that will allow them to sign in to be.
further notified throughout the;process:. .
iii. Please:note that the city will provide:the final:address list for
• you.
3. Please note that the-f rst review of the project is'approximately:25
:business days. All subsequent reviews are 15 business days:
Land Development-Javme.Chapin
1. Onsite retention will be required for the 100-year;2-hour storm for the site
• as well as the adjacent portions of Sarival Avenue and Reenis Road.
Please be:sure to coordinate utility stubs with-master developer:
2. Water and sewer will:not be'provided by City of Glendale: You will need to
work with EPCOR. Contact them early, if you haven't already to:;see if you •
are in their CC:& Nyet and what offsite.improvements will be required.
There is currently not a sewer in.Sarival.Avenue::
3. Sarival.Avenue is controlled by City of:Glendale. Improvements to include
. pavement to centerline of roadway, curb, gutter, detached 6-foot sidewalk,
streetlight and landscaping to section;determined by Transportation.
• 4. Soils Report should include recommendations for fissure area.
5. The overhead powerlines on;both Sarival Avenue and Peoria Avenue will
need to be placed underground.. .
6. Please investigate the irrigation in the area.You may need to continue
delivery of irrigation or accept tailwater from upstream areas. Any irrigation
SiPage
facilities that need to remain should be piped.:It is also likely that one of: ..
the ditches along Peoria Avenue is a MWD ditch: Reach out to MWD early
as the design and easement dedication process is lengthy:;
7. Fissure Information: See Redlines.
4°."''' ' 1*--.0",*$;,--4-,?--.11,- ;.,,.' ,2 E'`%•-,....,:g.
I " a,_ is �
Address/Location:te ik
A: 4 . ..
SW Peoria and Sarigal Avenues
L 1 '''' M
' n 1 Applicant:
zPEORIA.v ,, -- + 4 6 •i. ..:. r Jason Morris,Withey Morris Baugh PLCot Accessible
f &6; r C :OM ' F Zoning:PAD
elt `g A i �' P +� :i., Gross Acres*:'72.16
Ty�y
1 I+t " fFissureIntorrnat u i
• 1 c i:L..._....:-40.:=ILE MAP EXPLANATION .. .
y k - - n...•vaer m�seae.cv'awu 4' n.bq,o-e
. )1 1 1-�,�''�.F �Mn+6rvvov mseua emu: rmn.o.ama'uhw.aro-anm�.0 .
"?�¢" mnbnaf h' '''w.mni
� }.&�' i `I ..fnp%sYA•v a m4'maw�. Pew q
‘r= l; o aT.,�Heewnam.m.w.w2411 ..m..'a
�r
'�' k R9.0 .vV FWwbWwso M Uqurtm<w
rw 1�®�i�.i ra onvrp tlwaw
Transportation - Tony Abbo
8. See redlines
9. Adhere/include the following ADA requirements;
10.ADA compliant pedestrian access must be provided from all buildings to.
they/w : .
11:Show the placement of Blue RPM's by every fire hydrant.
12'.'The sight visibility triangle for the access point(s) needs to reflect the
guidelines listed in G-448
13.There shall be a five (5') minimum ADA compliant access from the
proposed development to the public R/W. The access needs to connect to
the building or buildings within the development.
14.'The sight visibility triangle for the access point(s) needs to reflect the
guidelines listed in G-448'.
15..Need to make sure that there are no trees within 25' of a light.pole -
please superimpose the street light plans on the landscaping plans and
draw.a 25' radius around each pole.
16.what if potential doesn't work'?
17:All'driveway aisle shall.be 23';min unless the fire department requires 26'.
18.6' detached sidewalk will be required on both Peoria and Sarival:
19.check.with the County/City of Peoria of they want lighting on Peoria Ave.
6IPage.
. • 20:a right:turn lane will. be required at this:intersection:
21.right turn lanes will be required for driveways on Sarival with a min 150' of
storage: .
• 22.a right turn.lane will be required at this'intersection.
23.0 contribution will. be required towards the:construction:of this signal
24:The typical section on Peoria.Avenue will be coordinated with both
MCDOT and/or Peoria for the following: .
: 1) Required:R/W .'
• 2).Access Location Access width
3) Access Type
• 4) Roadway:typical:section
25.Parkin ,spaces:should be 10'x20' If ou go with. -9' x 18'.min,.then you
need to:get:an administrative relief for the smaller parking spaces
26.From COG design standards: 4.52 MAXIMUM DRIVEWAY WIDTH
Notwithstanding the provision of:these standards,•where.ample . :.
: • justification-exists; the City may approve driveways up to a:maximum :
Width.of:45'feet...'
27.Based on:the.size and:type,of the development,:the following will be
required:
a. : .Traffic Statement (T.S.) site that generates less than 100 peak
hour trips.
b. Traffic Study requirements The developer shall follow the Glendale
Traffic Study process/requirements.
c.: :Prior to commencing work on:the study, the developer's consultant
:will be required to submit to:the:City of:Glendale the following.
information.for review and approval:
1)Study'area.
2)Trip:Generation. :
3)Trip distribution
4)Any trip reduction rates thatwiill be:used in the report-(if
applicable)licable
pp )
5)Date of when the counts were taken. Counts older than 2 years
: will not be accepted
: 6)Growth:rate: .• :
. d if:the driveway is not build on the property lime:it must be build at
least::75' north of the property line. We recommend a shared access
with the:property to the south.
28.Street lighting may be required on site or along the property frontage
:(typically 200'). Please contact David Winters at (623)930-2946 for :
specific requirements and/or. questions regarding the City's lighting
requirements.
•
7lPag.e .
The:2010 ADA current Glendale Transportation Standards, and Glendale •
2015 Engineering Standards shall be followed when developing the
• design review.and construction drawings for the project. •
A ny temporary, traffic control on public R.O.W:.shall.be subject to:a fee per
barricade.ordinance in addition to review fees.
• 29.Pedestrian access shall meet all current ADA requirements as well as.
other applicable city requirements.
https://ww‘caccesS-board.goy/prowag/Cornplete.html
https://www:glendaleaz:com/live/city_services/transportation services/sta
ndardsand_ maps
a. The pedestrian access plan shall meet the following: •
1) Access from the Public R/W to all buildings within the site:is_
required:..When providing access, it shall be-the most direct route.
to the public R/W (non-circuitous).
2) If the proposed development°ab .. .-
uts two or more roadways, there
shall
be access from each road to.the:buildings within the site..
3)All internal pedestrian paths shall be
5' in width. The pedestrian •
path shall be6' wide when adjacent to parking. 8' wide paths along
= the public street may be required by the City Traffic Engineer or
their designee for developments,or areas with high pedestrian
traffic.volumes.
4) The pedestrian::path shall not.be located along the:front of trash.
Collection.areas to ensure that Unlocked swing:gate(s) at.the.trash
enclosure area will not obstruct the pedestrian path:
5) Interconnectivity of pedestrian paths is required within a
development and with neighboring, similarly::zoned, developments:
6 When locating a pedestrian connection it shall be located as
near-as possible:to:existing or proposed crosswalks and bus stops..
7) No sharp angles or abrupt alignment changes will be accepted
along the pedestrian path when feasible.:
8) Pedestrian
paths must be grade separated from driving surfaces ,
accept when crossing drive aisles..
8lPage
9) If the pedestrian path crosses a drive aiisle, the crossing shall be
striped.
: : Fire-:Charles Jenkins
30 Fire access through this parcel is not provided. If this development is the
first phase:of construction for.the overall site, show how fire apparatus will
maneuver through the parcel:until the adjoining:parcels are developed:
31.Applicable:City of Glendale:codes IFC 2018 with local amendments and
2015 design and construction standards.
32.Fire Hydrants shall comply as per:IFG2018 and 2015 design and
construction standards (300ft maximum and 1000ft maximum arterial) fire
• access 26ft minimum with fire hydrant
33::Identify.any deferrals on cover sheet to include Fire Alarm, Fire Access
• Gates, Access Control
34:Provide master Fire Access plan to comply as per IFC 2018. and 2015
design and construction standards detail G-954 (32.6 inner and 52.6
outer) to include detail on:plans and all fire protection systems
35.:Identify fire hose pull:distances on master fire access plan to comply as
per IFC 2018 sec 503
36::Fire Sprinkler shall comply as per..IFC 2018 with local amendments.
throughout the entire building and:plans shall be submitted with building
submittal
37.:Identify all Fire Sprinkler riser locations to comply as per IFC 2018 sec.
903.3.8
38.:Identify remote FDC 1 OOft:from fire hydrant corner area of building near
fire lane to comply as per IFC 2018 with local amendments
39.:Fire Lane signage to comply as per IFC 2018:sec:D103.6.1, D103.6.2 and
2015 design and construction standards detail G-434
40:Water Supply shall comply'as per IFC 2018 with local amendments and
NFPA 13 2016 (include water flow test and duration)
41.Unknown occupancies shall comply as per IFC 2018 with local
amendments sec 903.2.13
9IP.age
42.Gates shall com I as IFC 2018 with local amendments to. include.
pY per,
-. keypad. :
Environmental Resources (Sydney Cleavenger):
43.The City of Glendale does not provide water or wastewater service to this
property. The City of:Glendale's designation of assured water supply does .
not extend to this property.
Please contact the private water:and.wastewater provider to discuss water
supplies and the quantity and quality of wastewater discharges. : Air
quality— Refer to Maricopa County Air Quality. Department's:requirements .:
for dust control:during construction. :
44. Stormwater= Undertake best management practices to;minimize.
pollutants (including sediments)entering the City's.stormWater system.
Provide protection from accidental discharge of pollutants to the public
storm drain system and corriplywith cleanup and notification.requirements -
in:Section :33-3.04 of City Code.
a) 'Per Section 33-303 of City Code, property owners or operators shall -
ensure proper operation and maintenance of post-constructionstormwater
runoff control mechanisms, including but not limited to retention basins,_
drywells, scuppers, and other measures implemented or installed at the:. . :
site to control or direct stormwater runoff..
b For disturbances of one:acre or more, refer to ADEQ requirements
for stormwater discharges under the:Construction General Permit.
c) If any drywells will be installed,follow ADEQ or EPA guidelines for
drywell registration depending on which agency has primacy of the
• Underground In ection Control UIC ro ram at the time of installation:
g . J p 9
:See the ADEQ website for information on ADEQ's Program Primacy.
Application. ;:
d) Depending on activities at the site, refer to ADEQ requirements for
stormwater:discharges from industrial::facilities under the Multi-Sector : •
General_Permit (MSGP). For. example, SIC Codes 4212-4231 for "Motor: •
Freight Transportation and Warehousing" is listed as a sector of industrial •
activity that is covered under.the:MSGP.
10Ip.age .