1 . Project: ' AZCCC Glendale .' .. Project#: 17-008
:Address: : :5750 West Thunderbird Rd : ' • Date:: 02/09/20.17
: Glendale,AZ 85306 From John Mike Lavrusky
To Archsol Cc::
• Skow Attn Mary:Riek.
FxIErta11: . :CSkow@archsolteam:corn • : Fx%Email:. Mary Riekc )honorhealth.com
Subject.
� •. AZCCC Glendale:Clarifications.:; ;_ . .. .. . ::: . ' ,",
Q
VESTION/CONFLICT Date Required /10/2017 : .
T.- As per the job walk today I have been cleared to proceed with using a tube steel in-wall brace for the
countertop. The brace will not be seen and is tucked up under the top `.. 0-
2.: :As per the conversation we had with the structural:engineer on Feb:76 we are OK to:use a.148 x 2 :
1/8"nail in lieu of the#8.2"screw:forthe plywood:Sheeting. Per detail 302 on page 52: -
:.3: I need confirmation that we are OK to use a SDS screws in lieu:of the#12 4"screw for the steel to ::
: wood connection:.Per detail 305 on page S2: They are actually a heavier duty screw
4. :I have field verified that there Is no"open":area of the truss to install the"additional web member at :
concentrated load as seen on page S2. Here is a pic of the existing truss condition::I need a new. :
detail by 2/10 as we starting framing on Saturday the 11th @ 7am
tam.�f 5�.42 �C.ti.3Gt
CONFIRMED WITH DAVID B:IXLER, IT IS:ACCEPTABLE TO CUT
THE VERTICAL MEMBERS AS NECESSARY TOFIT BETWEEN
THE WEBS, AND THEN HOLD EVERYTHING TOGETHER WITH::: ,. .
PLATES: (THE METHOD DESCRIBED AT:THE OAC MEETING:IS
ACCEPTABLE):-:LEA ANN LORZEL;.ARCHSOL.
5.. Does the 8'minimum distance between the parapet wall and RTU 1 need to be a flat surface?.The.
has a=an led back'cricket": As ofnow:the.unit will sit rou hl 4'6"awayfrom the cricket-to
::: parapet g g. y .
meet the:4'clear work area usually required for.equipment:.(orange:corners are curb:locations).
c. .
6. We have confirmed that the wall at the store front is not load bearing and we will continue the truss
reinforcement-to the end of the building. . -
PR
OPOSED SOLUTION
Please respond no later than the date indicated above: :If you have any questions,:please contact me as
soon as possible.;Thank you..
ANSWER./ RESOLUTION:: Date Answered