Loading...
HomeMy WebLinkAbout94305 qui 305 (4_----,::\\ Occupancy Activity Report '�� AI Glendale Fire Department i 6829 N 58th Dr. "3 ► sr' :r Glendale,AZ 85301 •Writ.,-•` (623)930-4420 M1f Da Year Page 20 1 Li l of No. Dir. Street Type i Suite Zip Code Sjb W IAN'n 6 Qr b)1`0 ,1-(1 10 0 Occupancy Name Phone Email CAlt\ Y�Q A ( ) ". Emergency Contact Phone 1 Fax PermltCM. ()8 ( ) Occupan Stories Sprinkkd Fire At!jam Hood Standpipe Clean Agepppt Knox Box Haz-Mat Insp.Type 1- Class r/ Above ' Below N J t�� ,�J y� ' , `12,`^, ( ('/�Cil ) / \/t1 Item Code Remarks men vmo 4_Q���� Corrected Date No. Section r l Ur7 pl0 ).e(+ 4 ►&Qns (1\noll hvk i hSpQL-hon o-hcs . The items noted above are in violation of the Glendale Fire Code.This is an official notice of violation and order to comply requiring immediate correction.A follow-up inspection will be conducted on to insure compliance.Failure to comply with this notice and order will result in a Civil or Criminal Complaint.For information regarding this inspection please contact the fire inspector at(623)930-4420. Printed Name Company Name /14 l i e M / -ee Received By Inspector Car - rtriARC architecture&design CONSTRUCTION CHANGE DIRECTIVE Date: 04/18/2016 CCD Number: 3 Project: SimonMED Thunderbird Project Number: 14-054 Prepared by: Edgar Moreno The following instructions change the contract documents to the extent defined.These instructions may change the cost of construction and may modify the schedule.Approval of the Owner and Architect will follow-see below.Changes in the cost of construction resulting from these instructions shall not delay commencement of the work.Notify the Architect of any conflicts created by these instructions prior to commencing work.This Construction Change Directive with costs& schedule implications will be required as part of the pay application review and approval. 1. All clarifications or revisions issued are changes to the original submittal. Revisions listed below incorporate these clarifications, changes, and additions: a. Delta 1 = Field Coordination 2. Following revisions to the Construction Documents: SHEET ACTION DESCRIPTION A-000 REVISE Revise construction classification for building. Construction classification updated to Building Type IV. A-401 REVISE Gyp. Bd. Ceiling in room "New Men's Toilet 4" to be changed to ACT. THESE CHANGES AND CLARIFICATIONS CONSTITUTE CHANGE DIRECTIVE 3. General Contractor: Impact on construction cost: impact on schedule: Architect: Date: Owner: Date: tr!ARC architecture &design, Ilc www.triARCdesign.com 99 East Virginia Avenue Suite 175 ; Phoenix,Arizona 85004 602.229.1 100 office i 602.229.1 101 fax YOUR STRUCTURAL ENGINEERING EXPERTS SPECIAL INSPECTION DAILY REPORT 4!)ill CONCRETE / REINFORCING cARUSO 1215 W.Rio Salado Pkwy. Tufty Suite 200 PAGE 1 OF 1 cKOTTn9 Tempe,AZ 85281 DATE TIME JOB NO. T:(480)774-1700 04-22-16 7:19 AM 15-940 S WC 50 structural F:(480)774-1701 engineers PROJECT Simon Med TO: triARC Architecture &Design LOCATION 5410 W Thunderbird Rd CITY Glendale,AZ 99 E Virginia Ave Suite 175 CONTRACTOR Mattson INSPECTOR Jim Juhl Phoenix,AZ 85004 PROJECT ENGINEER TRM/JVD ATTN: PRESENT AT SITE Kenny(Mattson) cc: Kenny@mattsonconstruction.com N Size, Spacing, and Grade of Vertical Reinforcing Steel N Concrete Tested for Slump and Sampled for Strength: X Size, Spacing, and Grade of Horizontal Reinforcing Steel N Name of Testing Company X Placement of Reinforcing Steel Including Required Clearances, and Support N Mix Design#and Concrete Strength N Dimensions(Depth,Width, or Thickness)of Formed Elements N Placement,Size, and Anchors on Embed Plates N Concrete Vibrated,#Vibrators on Site N Location of Control Joints N Size, Embedment, and Spacing of Anchor Bolts POST-TENSIONING X Size, Length,Spacing, and Placement of Dowels N Tendon Size, Quantity,Spacing X Rebar Lap Lengths N Tendon Drape&Clearances X Cleanliness&Dimensions of Foundations N Tendon Straightness N Concrete Time in Mixer N Condition of Tendon Sheathing N Water Added to Concrete? CI No ❑Yes N Sheathing Repair if Required LOCATION COMMENTS REFERENCED DETAILS Interior slab on grade at Inspected steel reinforcing in 11'0"X11'0" concrete slab on grade at GSN, Floor Plan existing slab. existing concrete. 8" thick with#4 at 12"o.c. centered in slab. S201, plan note. Corrections noted: (1) #4 mat less than 3"from soil at bottom of excavated area. Not GSN, 04, 06 centered. Corrected immediately. Approved and photograghed. (2) Lap splices less than insufficient, 25"'required at 4000psi per Typ. dtl. Corrected and photograghed. Approved by Eng.JVD. (3) Rebar mat cut out to make room for 12"X12" penetration boxes. Allowed by Eng. JVD (4) Dowels to existing concrete not required. Where installed -I, already recommended to be epoxied into holes. Per Eng. JVD Signed: U ( q Project Engineer: Inspector Work Codes:50=Typical,51=Reinspection,52=Repairs,53=Late Concrete/Grout,54=Cancelled,55=Sat/Sun/Holiday FILE:SSI REPORT-CONCRETE 2015.DOTX\MAL