HomeMy WebLinkAbout150537 Project:2241-033Modeme Arrowhead•J J —" I__ 15431 N:67th Avenues 7 S� _,BAR ,-,Glendale,Arizona 85306 MAYS --- CONSTRUCTION � S / J RFI #141: Holes Drilled on GLB TAI Rec'd Status Open 10-24-23 To Kristi Wilcox(Todd&Associates,Inc.) From Lisa Fojtik(A.R.Mays Construction) 20-2037-03 6900 E Indian School Rd Ste 200 Scottsdale,Arizona 85251 Date Initiated Oct 24,2023 Due Date Oct 27,2023 Location Project Stage Course of Construction Cost Impact TBD Schedule Impact TBD Spec Section 06 10 00-Rough Carpentry Cost Code Drawing Number Reference Linked Drawings Received From Jorge Loya Duarte(HJD Construction& Engineering) Copies To Lisa Fojtik(A.R.Mays Construction),Eric Loeffler(A.R.Mays Construction),Todd Olson(A.R.Mays Construction),Ray Reyes (A.R.Mays Construction),Mitchell Stewart(A.R.Mays Construction),Anthony Thomas(A.R.Mays Construction),Christine Vega (A.R.Mays Construction),Eric Wester(A.R.Mays Construction) Activity Question {----__—_------------ ---• -----..—_----------------------- j Question from Lisa Fojtik A.R.Mays Construction on Tuesday, Oct 24,2023 at 09:43 AM MST HJD Construction,framing contractor,is requesting structural FOR review of the attached.The lumber supplier is asking for the beam calculations that were done for this specific beam and to determine if this beam is still structurally functional with the added drilled hole.See attached. Attachments 3-1 Bin x 12in GLaptif,5-1_8in x 18in GLB.pdf Awaiting an Official Response Attached is the printout for the beam B-22 shown below. Reinforce the beam around the hole per the attached - - • detail SK-3. 311 r;. n Luis Duarte it Landa and Associates, Inc. 31 11-30-23 —2 B-11 Additional comment: f;wr • ° G fi I Only the 4.5" hole requires the steel plate reinforcement _`f�' °m I -0 the rest of the holes shown in the sketch provided do T J-3 1: I not require reinforcement and can remain as is. I ,� _ B-9 o B-9 1, i . ,� ' _Li-A J c-io o Luis Duarte Landa and Associates, Inc. 321 SIM 322 12-11-23 Page 1 of 1 Printed n:Oct 24, -.:. 09:43 AM MST 5" DIA. HOLE IN STEEL PLATE — CENTER TO MATCH CENTER OF EXISTING HOLE IN BEAM (FIELD VERIFY LOCATION) / X WOOD BEAM //////1" MIN. 2\,__ . 1/4"x 18"Dx 16"W STEEL - ° I PLATE EACH SIDE WITH (24) ° ° •••° — I� Al — 1/4"x2-1/2" SIMPSON SDS ° O � — SCREWS EACH • WOOD BEAM _ I 11 -v\` EXISTING HOLE "'� ° 1 1 IN BEAM cV0 EXISTING HOLE IN BEAM 1/4"x18"Dx16"W STEEL PLATE EACH SIDE WITH (24) 1/4"x2-1/2" SIMPSON SDS SCREWS EACH SK TITLE : JOB NAME : REPAIR FOR HOLE IN BEAM MODERNE ARROWHEAD SK- 3 �J • LANDA & ■_ 2_ ASSOCIATES, INC. °�e��El A f9lnB� p — m C m o`�`� No sA Consulting Structural Engineers y 42976 a DUARTE 5128 East Thomas Office: (602) 443-5515 11 30 23 Suite 100 Fax: (602) 443-5533 O/B Si �ea'�• Phoenix, Arizona 85018 JOB No.: LA19-144 9 4R/ZONA U S F• EXPIRES 9-30—2026