Loading...
HomeMy WebLinkAbout0000 (17) Qtat Analytical J� . ServicesQuu� am . NEBB — CERTIFIED TEST & BALANCE REPORT FOR: VILLAGE DIAMANTE 8050 N. 61ST AVE GLENDALE, AZ OUTSIDE AIRFLOWS ONLY PROJECT COORDINATOR BUTCH CARVER GENERAL CONTRACTOR LUCCHESI CONSTRUCTION SUBMITTED BY Q. C.ANALYTICAL SERVICES, INC. 15147 N. 73RD AVE. Pt1a tree!S Peoria,AZ 85381 G-• CERTIFICATION NUMBER 2365 oN Date Issued March 2, 2009 '� f AYJ•FLOOD r E:RTIFICATION JOB #8255 2365 � tied. Yarcnic S`!5 TCF o � 1 ® STATEMENT OF COMPLIANCE PROJECT/FACILITY: VILLAGE DIAMANTE-Outside air only GLENDALE, AZ THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES.ANY VARIANCES FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGHOUT. THE AIR&HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED AND FINAL ADJUSTMENTS HAVE BEEN MADE IN ACCORDANCE WITH"NEBB PROCEDURAL STANDARDS FOR THE TESTING, ADJUSTING, BALANCING,"THE PROJECT SPECIFICATIONS AND/OR AT THE OWNER'S DIRECTION. (SEE TEST DATA SHEETS) THE RESULTS SHOWN AND INFORMATION GIVEN IN THIS REPORT ARE CERTIFIED TO BE ACCURATE AND COMPLETE,TO THE EXTENT POSSIBLE BY EQUIPMENT AND PROCEDURES USED. Q. C.ANALYTICAL SERVICES, INC. CERTIFIES THAT THE EQUIPMENT OR SYSTEMS TESTED ARE OPERATING AT THE SPECIFIED LEVELS AS SHOWN AT THIS TIME AND MAKES NO OTHER CLAIMS, STATED OR IMPLIED, CONCERNING THE CONTINUED PERFORMANCE, OPERATION OR SAFETY IN USE OF THIS EQUIPMENT. SUBMITTED & CERTIFIED BY Q. C. ANALYTICAL SERVICES, INC. NEBB CERTIFICATION NO. 2365 TAB SUPERVISOR: TERRY J. FLOOD NATIONAL CERTIFICATION BOARD NO. 359001 SIGNATURE DATE 03/02/09 Q. C. ANALYTICAL SERVICES, INC. REVISED 5/13/98..SHEET2 SUMMARY FOR VILLAGE DIAMANTE SET OUTSIDE AIR 3/2/09 The intent of this summary is to indicate design condition and actual field conditions for equipment balanced, along with any concerns or deficiency that we may have encountered on the project. If you have any questions please call our _office at 623-486-2445, we would be happy to go over the report and project with you. DESIGN ACTUAL FPM AT PERCENT OF UNIT NO. OUTSIDE OUTSIDE AIR OPENING DESIGN AIRFLOW CFM AC-1 OSA 345 340 490 99% There was no other balance performed on the systems or were the smoke detectors tested at this time. Chris Flood /Terry J Flood Q.C. Analytical Services Inc \_.,y 1