REPORT FOR:
VILLAGE DIAMANTE
8050 N. 61ST AVE
GLENDALE, AZ
OUTSIDE AIRFLOWS ONLY
PROJECT
COORDINATOR BUTCH CARVER
GENERAL
CONTRACTOR LUCCHESI CONSTRUCTION
SUBMITTED
BY
Q. C.ANALYTICAL SERVICES, INC.
15147 N. 73RD AVE. Pt1a tree!S
Peoria,AZ 85381
G-•
CERTIFICATION NUMBER 2365 oN
Date Issued March 2, 2009 '� f AYJ•FLOOD
r E:RTIFICATION
JOB #8255 2365
�
tied.
Yarcnic S`!5
TCF
o �
1
®
STATEMENT OF COMPLIANCE
PROJECT/FACILITY: VILLAGE DIAMANTE-Outside air only
GLENDALE, AZ
THE DATA PRESENTED IN THIS REPORT IS AN EXACT RECORD OF SYSTEM PERFORMANCE
AND WAS OBTAINED IN ACCORDANCE WITH NEBB STANDARD PROCEDURES.ANY VARIANCES
FROM DESIGN QUANTITIES WHICH EXCEED NEBB TOLERANCES ARE NOTED THROUGHOUT.
THE AIR&HYDRONIC DISTRIBUTION SYSTEMS HAVE BEEN TESTED AND FINAL ADJUSTMENTS
HAVE BEEN MADE IN ACCORDANCE WITH"NEBB PROCEDURAL STANDARDS FOR THE TESTING,
ADJUSTING, BALANCING,"THE PROJECT SPECIFICATIONS AND/OR AT THE OWNER'S DIRECTION.
(SEE TEST DATA SHEETS)
THE RESULTS SHOWN AND INFORMATION GIVEN IN THIS REPORT ARE CERTIFIED TO BE
ACCURATE AND COMPLETE,TO THE EXTENT POSSIBLE BY EQUIPMENT AND PROCEDURES USED.
Q. C.ANALYTICAL SERVICES, INC. CERTIFIES THAT THE EQUIPMENT OR SYSTEMS TESTED ARE
OPERATING AT THE SPECIFIED LEVELS AS SHOWN AT THIS TIME AND MAKES NO OTHER CLAIMS,
STATED OR IMPLIED, CONCERNING THE CONTINUED PERFORMANCE, OPERATION OR SAFETY IN
USE OF THIS EQUIPMENT.
SUBMITTED & CERTIFIED BY Q. C. ANALYTICAL SERVICES, INC.
NEBB CERTIFICATION NO. 2365
TAB SUPERVISOR: TERRY J. FLOOD
NATIONAL CERTIFICATION BOARD NO. 359001
SIGNATURE DATE 03/02/09
Q. C. ANALYTICAL SERVICES, INC.
REVISED 5/13/98..SHEET2
SUMMARY
FOR
VILLAGE DIAMANTE
SET OUTSIDE AIR
3/2/09
The intent of this summary is to indicate design condition and actual field
conditions for equipment balanced, along with any concerns or deficiency that we
may have encountered on the project. If you have any questions please call our
_office at 623-486-2445, we would be happy to go over the report and project with
you.
DESIGN ACTUAL FPM AT PERCENT OF
UNIT NO. OUTSIDE OUTSIDE AIR OPENING DESIGN
AIRFLOW CFM
AC-1 OSA 345 340 490 99%
There was no other balance performed on the systems or were the smoke
detectors tested at this time.
Chris Flood /Terry J Flood
Q.C. Analytical Services Inc