HomeMy WebLinkAbout0000 (15) UNIVERSAL AIR BALANCE, INC.
HVAC TESTING, BALANCING, ENERGY SURVEYS
ANALYSIS, AUDITS AND FILTER REPLACEMENT
U.A.B 4618 E.Aire Libre Ave.,Phoenix,AZ 85032
Office# (480) 797-8275 Fax# (602) 482-1(X)7
AZ LIC. #ROC 190672
Date: April 20, 2007 BY: Pete Spengel
Project: MR. TILE SHOWROOM ,
5310 N. 43rd Ave. ito
::::::nicai
For: Inc. t,4 Z3 0 ;,
4038 E. Superior Ave. 44 � ,
Bldg. 2, Suite # 103 ;
Phoenix, AZ 85040
SMOKE DETECTOR TEST
UNIT DETECTOR MODEL TUBE SMOKE DUCT VELOCITY FIRE ACTUAL PASS
NUMBER MANUF. NUMBER LENGTH/ DETECTOR SIZE (FPM) PANEL D.P. OR
#OF HOLES LOCATION RESPONSE Tubes FAIL
FCU-1 AIR PRODUCTS SL2000N 19" 12 RETURN 18" X 20.5" 781 N/A +.187 PASS
FCU-2 AIR PRODUCTS SL2000N 21.5" 14 RETURN 21" X 14.5" 948 N/A +.122 PASS
FCU-3 AIR PRODUCTS SL2000N 21.5" 14 RETURN 20.5" x 14" 1005 N/A +.156 PASS
Visual Inspection:
Universal Air Balance, Inc.
Certifies to the best of our knowledge the above smoke detectors have been installed as close as possible to the manufactures
recommendations and as indicated on the drawings. The above data reflects the lowest readings measured at the detector.
The differential pressure between the inlet and exhaust sampling tubes must be greater than .01" and not to exceed 1.2".
Functional Test:
The smoke detector shut off the unit immediately upon detection of smoke from smoke in a can.
Note:
The smoke detectors were not wired to the fire panel at the time of test.
The smoke detectors have a Visual Red Alarm LED and Test Button located in the ceiling tile under the AC unit.
When the smoke detector detected smoke from smoke in a can the unit immediately Shut Down and the Red Alarm LED
illuminated.
OUTSIDE AIR TEST
UNIT DUCT REQUIRED REQUIRED PRELIMINARY PRELIMINARY FINAL FINAL PASS I
NUMBER SIZE FPM CFM FPM CFM FPM CFM FAIL
FCU-1 12" DIA 577 450 715 558 596 465 PASS
FCU-2 12" DIA 577 450 672 524 599 467 PASS
FCU-3 12" DIA 577 450 693 540 606 473 PASS
Universal Air Balance, Inc.
Certifies that the final CFM of air flow was set to within 10% of the Mechanical Engineers outside air CFM requirement.
Test Procedure:
The outside air CFM was set by traversing the outside air intake duct work to the unit return plenum for total air flow.