Loading...
000 (2) BACKFLOW PREVENTION ASSEMBLY TEST REPORT Water Purveyor Water Meter No. Permit No. I ,. (L Z. 7 i j ZZ- 3 / SV PVB Manufacturer Size Model No. Serial No. `RP DC W 1 1 tC.r n{5 i ,i `j % X G, • -• - 8 2-- l-F / S Owner Person to Contact Phone No. Address City, State,Zip y 4, o /I i, _,"1-c,-/f"r� t i'• L, -r\ .,- ; = r-, ,% , : ``. SL o Owner Representative Person to Contact Phone No. /i i // ,VJ L _Q/ 3 -1,.'oi Representative Address Assembly Address ✓ i. L)i On Site Location of Assembly ` Line Pressure i What is the Primary Business or Service Performed Is this a new installation? fiit Yes 0 No at this location? Does this assembly replace another? No 0 Yes Serial# Purpose: Secondary/Containment* Primary/Point of Use 0 Fire System 0 Landscape D• Potable/Domestic ❑ Pressure Vacuum Double Check Valve Assembly OR Reduced Pressure Principle Valve Assembly Breaker Back Pressure Y N DIFFERENTIAL AIR INLET OPENED CHECK VALVE #1 CHECK VALVE #2 PRESSURE RELIEF AT PSID VALVE LEAKED Y N 1. CLOSED TIGHT Y N 1. CLOSED TIGHT Y N OPENED AT CHECK VALVE HELD INITIAL TEST , y PSIDx. PSID ? <4' PSID AT PSID 2. LEAKED Y N 2. LEAKED Y N DID NOT OPEN Y N 2. LEAKED Y N CLEANED Y N CLEANED Y N CLEANED Y N CLEANED Y N REPLACED RUBBER KIT REPLACED RUBBER KIT REPLACED RUBBER REPLACED RUBBER Y N Y N KIT Y N KIT Y N cc DISC Y N DISC Y N DISC Y N DISC Y N d SPRING Y N SPRING Y N SPRING Y N SPRING Y N GUIDE Y N GUIDE Y N GUIDE Y N GUIDE Y N OTHER Y N OTHER Y N OTHER Y N OTHER Y N SHUT OFF VALVE# REPAIRED 0 REPLACED 0 BOTH OK ❑ OPENED AT 1. CLOSED TIGHT Y N 1. CLOSED TIGHT Y N AIR INLET PSID FINAL TEST PSID PSID PSID CHECK VALVE PSID REDUCED PRESSURE This report is certified to be true. ' INITIAL TEST (IF FAILED) BY: CERTIFIED TESTER NO. DATE FAILED TEST KIT SERIAL# REPAIRED (IF NECESSARY) BY: CERTIFICATION NO. REPAIR DATE FINAL TEST BY: / 'I CERTIFIED TESTER NO. DATE PASSED TEST KIT SERIAL# /te a. -"i !.. ^ C» ,_, z_ U ! COMMENTS: _Annual _Annual w Repair—Repair Only (C of 0_ Hydrant Meter _Temp. Construction j_ .7 J 7 L L r-b ; ,ji E.4-, /\,-, ;.__ ;-- BPDI Backflow Prevention Device Inspections, Inc. 3831 E. Grove Street. Phoenix AZ 85040 PH: 602-788-5411 FAX: 602-788-6104 BACKFLOW PREVENTION ASSEMBLY TEST REPORT Water Purveyor Water Meter No. Permit No. SVE1- PVB Manufacturer ' Size Model No. Serial No. RP DC ,",ci i / .G( tJ' .) / % X 2--- _ k L < 5 i o Owner Person to Contact Phone No.� r_ H'�/E_/�/ A',/ i- : .,F ,� 1 ,�c-"/Z <,c' /?- - /i s.' Address City, State, Zip 9 C, ,--) nl . r` _,'1-r /1 ; / / '7 _//) ii-/ , �P 0( 2 I- Owner Representative — Person to Contact Phone No. R//% '(..9c')-/ Representative Address Assembly Address J' L.) 4. 'J C-I-1). ' ;r=-f 1 On Site Location of Assembly Line Pressure IZ What is the Primary Business or Service Performed Is this a new installation? 1 Yes ❑ No at this location? Does this assembly replace another? VT No El Yes Serial# Purpose: Secondary/Containment 0 Primary/Point of Use ❑ Fire System 0 Landscape El Potable/Domestic 0 Pressure Vacuum Double Check Valve Assembly OR Reduced Pressure Principle Valve Assembly Breaker Back Pressure Y N DIFFERENTIAL AIR INLET OPENED CHECK VALVE#1 CHECK VALVE#2 PRESSURE RELIEF AT PSID VALVE LEAKED Y N 1. CLOSED TIGHT Y N 1. CLOSED TIGHT Y N OPENED AT CHECK VALVE HELD INITIAL TEST PSID PSID PSID AT PSID 2. LEAKED Y N 2. LEAKED Y N DID NOT OPEN Y N 2. LEAKED Y N CLEANED Y N CLEANED Y N CLEANED Y N CLEANED Y N REPLACED RUBBER KIT REPLACED RUBBER KIT REPLACED RUBBER REPLACED RUBBER Y N Y N KIT Y N KIT Y N Q DISC Y N DISC Y N DISC Y N DISC Y N 1.11 SPRING Y N SPRING Y N SPRING Y N SPRING Y N GUIDE Y N GUIDE Y N GUIDE Y N GUIDE Y N OTHER Y N OTHER Y N OTHER Y N OTHER Y N SHUT OFF VALVE# REPAIRED El REPLACED 0 BOTH OK El OPENED AT 1. CLOSED TIGHT Y N 1. CLOSED TIGHT Y N AIR INLET PSID FINAL TEST PSID PSID PSID CHECK VALVE PSID REDUCED PRESSURE — This report is certified to be true. INITIAL TEST (IF FAILED) BY: CERTIFIED TESTER NO. DATE FAILED TEST KIT SERIAL# REPAIRED (IF NECESSARY) BY: CERTIFICATION NO. REPAIR DATE FINAL TEST BY: j.- CERTIFIED TESTER NO. DATE PASSED TEST KIT SERIAL# :L.--1-1,. -,* .T.L 5 - - 2._:-. L. ", / --/ // _. COMMENTS: _Annual _Annual w Repair—Repair Only C of 0 Hydrant Meter Temp. Construction • BPDI Backflow Prevention Device Inspections, Inc. 3831 E. Grove Street, Phoenix AZ 85040 PH: 602-788-5411 FAX: 602-788-6104