HomeMy WebLinkAboutMinutes - Minutes - City Council - Meeting Date: 4/5/2016 City of Glendale
5850 West Glendale Avenue
Glendale, AZ 85301
ril#P1
GLEN to
Meeting Minutes - Final
Tuesday, April 5, 2016
1:30 PM
Regular Workshop
Council Chambers
City Council Workshop
Mayor Jerry Weiers
Vice Mayor Ian Hugh
Councilmember Jamie Aldama
Councilmember Samuel Chavira
Councilmember Ray Malnar
Councilmember Lauren Tolmachoff
Councilmember Bart Turner
City Council Workshop Meeting Minutes-Final April 5,2016
CALL TO ORDER
Present 7- Mayor Jerry Weiers, Vice Mayor Ian Hugh, Councilmember Jamie Aldama,
Councilmember Samuel Chavira, Councilmember Ray Malnar, Councilmember
Lauren Tolmachoff, and Councilmember Bart Turner
Also present were Kevin Phelps, City Manager; Michael Bailey, City Attorney; and
Pamela Hanna, City Clerk.
WORKSHOP SESSION
Mayor Weiers announced that Item#3 had been pulled administratively.
1. 16-133 PRESENTATION ON WESTERN AREA BRANCH LIBRARY CONCEPT
Staff Contact and Presenter: Erik Strunk, Director, Community Services
Staff Presenter: Michael Beck, Chief Librarian, Community Services
Guest Presenter: Ms. Paula Wilson, Chairperson, Library Advisory Board
Guest Presenter: Mr. Michael Schmitt, Principal Architect, Dick & Fritsche
Design Group
Mr. Strunk said this item is a follow up on a request to discuss establishing a Western
Area Branch Library at the Media Center, as well as reviewing other library concepts such
as construction of a prefab building for a library at Heroes Park. Mr. Strunk introduced
the Chairperson of the Library Advisory Board, Ms. Paula Wilson, and Chief Librarian,
Michael Beck. Mr. Strunk also recognized Michael Schmitt, Principal Architect of Dick &
Fritsche Design Group.
Mr. Strunk provided a timeline from 1998 to the present on the Western Area Library
proposed in Heroes Park. The timeline included acquiring the land at Heroes Park and
completion of Phase I and Phase II of Heroes Regional Park. Due to the economic
downturn, construction of this project was completely removed from the CIP plan in 2013.
He explained there weren't sufficient funds to construct the facility as designed and there
were no funds for operating expenses. In 2015, the concept of a Western Area Branch
Library was revisited and staff was directed to develop cost estimates and conceptual
designs of a possible library.
Mr. Strunk explained the public outreach process was robust with a 7 week engagement
process, a special website and a telephone hotline for public comment. He said staff
also explored the option of using the third floor of the Media Center as a library. A cost
comparison was made between using the third floor at the Media center as a library and
using a prefab facility plus additional parking at Heroes Park. He said assumptions were
made there were no operating funds for any facility, and the only funds available was
about $2.7 million in development impact fee money. The facility would have a 40 hour
per week operation and would operate Monday through Saturday. He said staff
envisioned a full service library, but on a smaller scale than what was originally envisioned
at Heroes Park. The collection would consist of 25,000 items, which included books and
other materials. He also said requested books would be available at either facility within
24 to 48 hours after request. This is the same service currently provided at all three
Glendale branch libraries.
City of Glendale Page 1 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
Mr. Beck provided information on the conceptual designs for both the Media Center and
Heroes Park libraries. He went over the floor plan of the Media Center and provided
pictures of the concept of a third floor library. This design included youth, teen and adult
areas, as well as a multi-purpose room and staff work room. He explained there is an
open area on the 4th floor, which would lend itself to library special events and programs.
Mr. Beck provided a digital 360 degree tour of the Media Center library concept.
Mr. Beck provided information put together by the architect which came from public input.
This library concept would leverage an existing city-owned facility, offered covered roof
exterior areas, a lower initial cost than option 2, provides potential use of green screen
area by library patrons, allows existing office space for library staff and is centrally
located in the western service area. Areas of concern about utilizing this space for a
library include forced closure during major Westgate events (approximately 70
events/days per year), insufficient parking immediately adjacent to the building, less than
optimal access between the library and the parking garage, potential staff insufficiency
associated with a split floor layout of staff offices and public space, primarily
non-residential area, future expansion is not possible, smaller usable patron area, lack of
bicycle and pedestrian accessibility, no location for drive-by book return, requires costly
and temporarily disruptive structural changes to accommodate bookshelf areas.
Mr. Beck next provided information about the potential library facility at Heroes Regional
Park. This facility could be constructed in a manner to accommodate future expansion.
The library would be located across the street from the current splash pad and X-court
building and would have 53 parking spaces. This floor plan would also contain distinct,
youth, teen and adult areas as well as a service desk, two study rooms, a multi-purpose
room, staff work room areas, a drive up window and outdoor areas for special
programming. Public input expressed a desire for music and performance programs. Mr.
Beck showed a 3D video of a proposed facility at Heroes Regional Park. Some benefits
of having a library at Heroes Park include the facility is adjacent to an existing public
park, easy year-round accessibility, larger usable patron areas than in option 1, easily
accommodates future expansion. Areas of concern include a higher initial cost, requires
new construction in undeveloped park areas, and this location is not as centrally located
in the western service area as option 1.
Ms. Wilson explained 51% of public input preferred a Heroes Park location. Regarding
accessibility and location of the proposed site, the top three concerns were convenient
and ample parking, safe routing access for pedestrians and bicyclists and ease of vehicle
access. Ms. Wilson said respondents would like to check out books, movies and music,
attend programming for children and teens and adult programming most often at the
Western Area Branch Library. Respondents would most like to see music and
performance programs, infant and toddler story times, and youth story times for ages 5-8
programs featured at the library. Ms. Wilson explained the Library Advisory Board and
the Parks and Recreation Advisory Commission approved moving forward with the Heroes
Park Library concept.
Mr. Strunk said based on all information provided and public input received, staff's
recommendation is to move forward with the Heroes Park site. He said the cost is about
$2.7 million to build and furnish the library. He said operating costs would be
approximately $600,000 per year. Mr. Strunk said if Council approves this item,
development impact fees would be used to fund this project. He explained design would
take place in FY16-17 and construction would begin in FY17-18. Some operating funds
would need to be available in FY17-18,with full operating expenses available in FY18-19.
Mayor Weiers asked about the conceptual design presentation which showed a coffee
City of Glendale Page 2 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
bar. He said that was not part of Mr. Beck's presentation.
Mr. Beck said the area could be a café with bistro seating or stocked with café vending
machines. He said this could include a coffee bar.
Mayor Weiers asked about the possibility of renting out the space to a small business
that would provide a service to library patrons. He said there might be a potential
partnership there.
Mr. Beck said an RFP could be done for that.
Councilmember Chavira said he is totally in favor with moving forward with this Heroes
Park project. He also mentioned meetings were going to be held very soon with City staff
and the County to help offset the cost of this Heroes Park Library. He said he likes the
idea of a partnership with the County to complete this project. He spoke about the
disparity of libraries in the West Valley.
Councilmember Aldama asked how the square footage of this library compared to other
libraries.
Mr. Strunk said the Velma Teague Library is about 14,500 square feet, so the Western
Area Branch Library would be about 7,500 to 8,000 square feet.
Councilmember Aldama asked if it would be the intent to build onto this facility in the
future.
Mr. Strunk said they asked this project to be designed to allow future expansion and
growth. The design will accommodate that growth. He explained the vision for this
project is a 33,500 square foot library.
Councilmember Aldama asked if the initial project was considered Phase 1 and if a
funding mechanism would be put in place to ensure completion of this project.
Mr. Strunk said he would await Council direction on that issue, but park facilities have
been phased in before.
Councilmember Tolmachoff said she was glad they were discussing building a library
while many cities were closing them. She was concerned that there is so much online
content now and asked if a 33,000 square foot library is needed. She asked what
percentage of library customers are using online content.
Mr. Beck said online circulation is about 10% of the collection, but it is growing. He said
citizens like libraries as they offer programs for its residents and is a community
gathering place. He also said the public meeting rooms are rented out and used
extensively. He said technology is changing the way libraries work. Annual surveys are
done to determine the needs of the residents served by the library.
Councilmember Tolmachoff asked where the 83 parking spaces would be placed and
asked if the lighting and striping is all included.
Mr. Beck explained where the initial 53 parking spaces would be located and an
additional 83 spaces would be added upon full completion of the project.
Councilmember Turner said this item first came up during discussions about selling the
City of Glendale Page 3 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
Foothills Library, and he said the proposed concept for the high tech library caught his
interest. He was glad funds were located to assist with building this library. He said the
design concepts were going to work, especially for future expansion. He said they still
need to find where the $600,000 in operating costs was going to come from. He spoke
about the public meetings and was disappointed only about 30 participants attended, and
he was concerned and disappointed there wasn't more public interest. He asked if the
concept showed the library at the site that had been pre-planned for the library.
Mr. Strunk explained where the pre-planned site was in relation to the conceptual
drawings. He said the full service library, an aquatics center and a recreation center are
proposed for this area.
Councilmember Turner asked about the relationship of the location of the aquatics center
to the proposed library. He said co-locating those facilities would be beneficial.
Mr. Strunk said joint facilities are being built elsewhere in the country and this footprint
would allow for this as well.
Mr. Beck said the General Plan called for a new library once the population reached
35,000 in a service area and they have gone beyond that now. Citing a prior West Area
Regional Facility Master Plan, he said the public's number one choice for new facilities
was a library. He said there is demand and support for this library.
Councilmember Turner said this is a viable project. He also liked the idea of potentially
partnering with the County. He said there are many big questions that still need to be
answered.
Councilmember Malnar said the surveys speak loud and clear on what citizens want. He
asked what percentage of the public needs will this library provide.
Mr. Beck said the public wants youth and teen programming as there are many families
in the area. Also, the public wants musical performances and similar programming. He
continued the city does care what citizen's think and the library will do its best to stay
relevant by eliciting feedback from residents.
Councilmember Malnar asked if the operating costs are feasible and asked if staff has
worked with the Finance Department to evaluate those costs.
Mr. Strunk said these expenses are in the five year plan. Staff took into consideration
the operating costs of the other three branch libraries and did a ratio analysis based on
the proposed square footage. Staffing levels have been identified and the $600,000 figure
includes all operating expenses, book materials and programming.
Councilmember Malnar said the $2.7 million was being taken away from providing
additional services at other Glendale libraries. He asked if the city was losing more than
they were gaining by using those funds to build another library.
Mr. Strunk said the $2.7 million is development impact fee money was specifically
collected for a library. They can be used to construct, equip, build and open a new
library. They cannot be used for operating funds. He said they are allowed to use those
for levels of service in the other existing libraries, but they haven't determined what
improvements to those levels of service would be. If the Western Area Branch Library is
not built, staff would assess what increased levels of service those funds could be used
for in the other libraries.
City of Glendale Page 4 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
Mayor Weiers asked if the city is meeting the requirements or expectations from the
citizens on levels of service at the other three libraries. He said he has had people tell
him they want more from the existing three libraries.
Mr. Strunk said there have been comments in surveys that request adding additional
library hours, but this hasn't been sent to Council through a budget request. He said
there is interest in expanding library hours at existing libraries.
Mayor Weiers asked if staff could provide the cost of adding additional hours to the three
libraries. He also spoke about the outdoor activities and parking issues. He asked if the
parking lot could be put on the west side of the building to allow parking and better
access for residents who use Heroes Park. He also said they should look into
establishing the extra parking immediately as that is a very big problem at that park. He
would like staff to research the cost of that as well.
Mr. Strunk said he would follow up with that. He said in a recent presentation on Heroes
Park, one of the issues addressed was parking. He said there was previous direction
from Council to use some DIF money for parking north and east of the traffic circle. He
said it was also intended to finish off 83rd Avenue and put in gutters and sidewalks to
make it usable for residents.
Mayor Weiers said he would rather see the city putting the funds into permanent parking
instead of temporary parking.
Councilmember Chavira said the current amenities utilize the parking and said the
archery range will also create more parking issues. He asked how to temporarily fix the
parking problem as it is a safety issue.
Mr. Strunk said staff is aware of the severe parking issues that park has and they are
currently working on a resolution.
Councilmember Chavira said that does not even include parking for the ramadas as they
are used throughout the year.
Councilmember Aldama agreed with Councilmember Turner that not many people
attended the public meetings about the proposed library. He spoke about the number of
surveys received from the Ocotillo and Yucca District citizens He asked if the residents
are truly being served by the Velma Teague Library. He wondered why so many Ocotillo
residents were interested in the new library and asked staff for input on that issue.
Councilmember Tolmachoff said she calculated the per hour rate to keep the new library
open and asked if the highest part of that cost was staffing.
Mr. Beck said about$450,000 of the$600,000 of the cost annually is staffing.
Councilmember Tolmachoff asked how many volunteers are serving the library right now.
Mr. Beck said about 500 volunteers contribute approximately 15,000 volunteer service
hours per year.
Councilmember Tolmachoff asked about exploring the possibility of internships with
various colleges in the area,to provide increased service to residents.
Mr. Strunk said staff has not looked at that specifically, and they will work with any
City of Glendale Page 5 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
educational facility or any student who is interested. He said the $600,000 cost is for the
basic core staff to run the library, including supervise and operate the front desk. He said
volunteers don't always show up regularly and when planning for these services, they
need to take that into consideration. He said they have been very successful using
volunteers within the city.
Mayor Weiers said there is a consensus to continue on with this project.
Mr. Strunk asked if consensus meant to commence design work on the Heroes Park
concept.
Mayor Weiers said that is the next step.
2. 16-130 PAVEMENT MANAGEMENT PROGRAM PRESENTATION
Staff Contact and Presenter: Jack Friedline, Director, Public Works
Staff Presenter: Vicki Rios, Interim Director, Finance and Technology
Staff Presenter: David Beard, City Engineer
Staff Presenter: Max Morales, Streets Superintendent
Mr. Friedline introduced David Beard, City Engineer, Vicki Rios, Interim Finance Director
and Max Morales, Streets Maintenance Superintendent. He said the pavement
management program is a five year program with estimates for funding to bring streets
back to their previous condition. He discussed the way the streets were evaluated and
the process to repair the streets. He explained the five year funding plan has a $77
million budget. About $45 million is available and budgeted through HURF and GO funds.
He explained $6 million is budgeted and available to do in house maintenance and
repairs. He said there is a request for $26 million in General Obligation Bonds funding
specific for street reconstruction. The pavement management program keeps the streets
in good condition, ensures maintenance of the streets are accomplished in the most
effective and efficient manner possible. Mr. Friedline went on to describe the Glendale
roadway network,which is a functional classification distribution by length.
Mr. Beard discussed the pavement life cycle and how pavement degrades over time. He
provided information on the three types of treatments used to repair streets. Those
include slurry, mill and overlay and reconstruction and rehabilitation. He explained that
making repairs early will save eight times the cost at a later date. He provided
information on the pavement condition index as well as the treatment used to preserve
the pavement over time. Mr. Beard provided photos of several streets and their PCI
rating. He also provided information on the average PCI for city streets.
Mr. Friedline said the average PCI for Glendale streets is 65.5. He provided a graph
showing the various street work that has been done since 2014. He said there will be an
$8 million contract coming forward in June for mill and overlay work for streets south of
Peoria Avenue. There will also be a $2 million contract brought forward in August for
slurry sealing citywide. Mr. Friedline provided a representation showing spending history
and proposed funding by fiscal year. He also provided further information on a plan
breakdown by street segment and the type of treatment for FY 2017-2021. He also
explained the level of funding each year for pavement management and how it relates to
an average PCI within the system. He explained the level of marginal and poor streets
continues to increase. He said staff is recommending $15.5 million a year which will level
off the PCI and will increase it from 65.5 to about 70. He explained 60 miles of the
roadways require no rehabilitation and are in great shape. Mr. Friedline said FY17-21
City of Glendale Page 6 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
addresses 511 miles of roadway and FY22-23 addresses 134 miles of streets. He said
700 miles of streets will be addressed within 10 years.
Ms. Rios showed information on the city's debt service on the General Obligation Bonds.
She said about $20 million in revenue is received by the city from the secondary property
tax levy each year. She said debt service payments remain high until about FY21-22 and
drop off after that. She provided further information about adding the funds to complete
the street improvements to the city's current debt. This included debt for the
improvements for land for parking in Lots P1 and P2 which are being issued this week.
Series 2018 is a proposed bond issue for $10 million in the CIP as a placeholder for
additional improvements to the P2 lot at Westgate. Series 2019 debt is the first of two
bond issues, totaling $10.6 million, which is the first of two years of the pavement
management system. The last bond issue is Series 2021 which is the last bond issue
for the pavement management. This is three years of $5.3 million per year. She said
utilizing this option would give the city very little additional opportunity to use General
Obligation Bonds for anything else until at least FY22-23.
Mr. Friedline said the $26.5 million will address street sections that cannot be addressed
any other way, and he showed an arterial reconstruction and rehabilitation plan and a
collector reconstruction and rehabilitation plan.
Mayor Weiers asked if the Glendale is 100% responsible for Camelback Road as it is the
City's border with Phoenix.
Mr. Friedline said since Glendale is on the north side of this arterial street, Glendale
maintains the entire street. He provided a graph showing street reconstruction and
rehabilitation for each fiscal year through FY2021. He explained the in-house work is a
$6 million project over the next five years.
Mr. Morales provided an overview of the street maintenance perspective. He explained
over the years, streets maintenance staff has been reduced to 4 employees and 8 pieces
of equipment, but they do pothole repair, localized asphalt repair and concrete repairs.
They also use contracted repairs to supplement their efforts. He said staff is primarily
reactive and respond to inquiries from residents and staff. They are on track to complete
over 11,000 repairs. He explained pothole repairs are temporary in nature, but staff is
working on long term repairs.
Mr. Friedline said there is a supplemental budget item for increased staffing in this
section with some equipment that supplants the contract work. It will save at least 50%
in costs. For the same amount of money, staff will be able to do about two to three times
the amount of square footage work of localized asphalt repairs as they could by contract.
Councilmember Malnar asked how they are getting from $10 million a year to $26 million
a year.
Mr. Friedline said the $26 million is the amount of money suggested by the consultant
that needed to be spent to get a PCI over 72.
Ms. Rios said the $26.5 million is the aggregate effect of adding $5.3 million for each of
five years. She said it is just coincidental that it equals the other $26 million mentioned
on the slide. She said it is the difference between what the city currently has in funding
which is $10.2, increasing that to $15.5, and to do that, the city would have to borrow
$5.3 million a year for each of five years. Instead of borrowing $5.3 each year, the city
would issue bonds for $10.5 and then several years later, issue bonds for $15 million and
City of Glendale Page 7 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
that equals the$26 million.
Councilmember Turner asked if the city had $23 million in HURF money in the bank now,
and if the city anticipates about$14 million in HURF money annually.
Mr. Friedline said there are a lot of HURF dollars that are allocated to other parts of the
Public Works Department and Transportation. He said the funds they are talking about
today just represent the streets maintenance section.
Councilmember Turner asked if there was any way to do more of this work earlier and
less of it later to get ahead of the deterioration.
Mr. Friedline said they can and Mr. Beard is working on a more streamlined process to
contract services. He said he hopes to develop a contract that can be renewed so the
work can proceed expeditiously. He said they have blocked this out over five years, but if
there is a way to get it done fast, they will absolutely do that. He discussed the mill and
overlay and how staff works with Councilmembers when working in their districts to see if
there are any issues on any of the streets that need work.
Councilmember Turner asked if the project could be expedited if the city were to receive
more HURF funds.
Mr. Friedline said the program could do front end funding and they could easily do 25%
more, although they might need more staffing to do that.
Councilmember Turner asked if the worst streets would be addressed first.
Mr. Friedline said the worst streets need to be reconstructed. Since the city does not
have bonding capacity the first year, reconstruction work would not be done. If the
streets get too bad before they can be fixed, the city would do some slurry to temporarily
correct the problems until the streets could be fixed permanently.
Councilmember Turner sent his compliments to the streets department staff for doing
work at half the cost to contract it out. He asked about entering into partnerships with
other cities to utilize idle equipment instead of increasing staffing levels.
Mr. Friedline said the streets maintenance department does many specialized or
localized repairs. He said when doing miles of slurry seal or miles of overlay, it is best to
go to the open market and bid it out. He said in house help who are trained in this type
of work help out greatly in reviewing contracts to make sure the city gets its money's
worth.
Mayor Weiers asked what the temperature needs to be to do this type of streets
maintenance work.
Mr. Beard said they like to wait until the Fall or Spring to do slurry seal. He said when it
is very hot; mill and overlay will take a little longer to cure. The temperature does not
hold up the work.
Mayor Weiers asked about rain.
Mr. Beard said they cannot work when the pavement is wet.
Mayor Weiers and Mr. Beard had further discussion about the pavement and base being
City of Glendale Page 8 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
wet and drying it out before any repair work can be done.
Councilmember Aldama asked where 71st Avenue between Myrtle and Orangewood are
in the plan.
Mr. Friedline said that is in the CIP under a specialized program called Scalloped
Streets.
Councilmember Aidama said many people have inquired about that road and he wanted
the audience to know about that project.
Councilmember Tolmachoff asked about the$23 million in HURF funds.
Mr. Friedline said the $23 million he was addressing was the HURF fund balance, and
they are planning on spending that down over the 7 year period.
Councilmember Tolmachoff asked if they were going to bond over a period of time and not
go out and bond for the entire project all at once.
Ms. Rios said there are different uses for the different types of funds. She said they
would not recommend issuing bond funds for regular maintenance, so bond funds can
only be used for the major construction projects. She said they are looking at using the
HURF money and the other transportation money to do the roads that are in the earlier
stages before they need major reconstruction. She said there is a plan to spend down
the fund balances. She said there is about $14 million coming in per year from HURF
and about $7 million of it that goes to other operations. That frees up about $7 million to
be used for these projects, and that will spend down the $23 million in fund balance, but it
will not address the major reconstruction work that needs to be done. Those funds are
appropriate for the other type of work. The bonds will be issued for the reconstruction
work.
Councilmember Tolmachoff asked if the $14 million in HURF funds the city gets is a
conservative projection and if it is what the city is getting now from the state.
Ms. Rios said that is correct.
Councilmember Tolmachoff said she does not want to box the city into a corner by
maxing out on general obligation debt.
Ms. Rios said today staff is looking for some direction, but at a point in time before those
reconstructions begin, staff would come back to Council with a notice of intent to issue
those bonds. Once the city starts spending those funds with the intent to reimburse the
city, they would be locked into issuing those GO bonds. They do not have to do that
today.
Councilmember Tolmachoff said every extra million received in HURF funds from the state
would be that much less the city would have to borrow.
Ms. Rios said that is correct.
Mayor Weiers said the intent is to leave HURF alone and possibly getting more funds.
Mr. Stoddard said they are starting to get some high level information from the
Legislature. He said that information does not list any type of HURF restoration and it
City of Glendale Page 9 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
calls for an increase in staffing and raises for DPS. He said the HURF funds have
continually been used to fund DPS in the past. He said it appears they may continue to
take in the$90 million range of HURF.
Mayor Weiers asked if there was the potential for a slight increase in HURF funds
because the economy is doing better.
Mr. Stoddard said they have held the level consistent and haven't increased what the
state takes;there may be a slight increase to the city's portion of the funds.
Councilmember Turner asked for a brief history of HURF funds.
Mr. Stoddard provided a history of HURF funds and where those funds come from. He
said these funds are only for transportation projects in the state. He described how the
state swept monies from HURF for the last several years. The state has used these
funds for Motor Vehicle Department and DPS. He said this has taken its toll on cities
and towns throughout the state.
Councilmember Turner asked how much of the monies swept over the last few years
might have come to Glendale.
Mr. Stoddard said the formula is complicated and changes each year and staff has not
run the analysis to see what the number is.
Councilmember Malnar said he is in favor of moving this forward but has concerns about
where the money is coming from. He asked staff to put together a spreadsheet to show
where the money is coming from each year, whether it is from bonds, GO or anywhere
else.
Mr. Friedline said one of the charts provided in the Council packets shows the GO bonds
and said everything else is HURF money.
Councilmember Malnar said he would like that in a spreadsheet.
Councilmember Tolmachoff asked about the sweep of the HURF funds and the amount
the city has lost due to the sweeps, and amount it will cost taxpayers due to the sweeps
of those monies.
Mr. Friedline said the price tag is$26.5 million in GO bonds.
Ms. Rios said she can provide the numbers.
Councilmember Chavira asked about the city's financial bandwidth with the bonding
process. He asked if there is any way they can maximize the bandwidth.
Councilmember Aldama said this would be the time to get this in place and get the
streets repaired.
Councilmember Chavira said he would like to complete this project, but wanted to do it in
a prudent manner that will not impede any other projects.
Mayor Weiers said there was consensus to move forward with this.
City of Glendale Page 10 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
3. 16-123 COUNCIL ITEM OF SPECIAL INTEREST—BOARDS AND
COMMISSIONS
Staff Contact and Presenter: Michael D. Bailey, City Attorney
This item was administratively pulled from the agenda.
4. 16-153 OVERVIEW OF AEG FACILITIES' ARENA MANAGEMENT
Staff Contact: Tom Duensing, Assistant City Manager
Guest Presenter: Mr. Chuck Steedman, AEG Facilities, Chief Operating
Officer
Guest Presenter: Mr. Matt Bettenhausen, AEG Facilities, Chief Security
Officer
Guest Presenter: Mr. Eric Bresler, AEG Facilities, Vice President, Content
Development
Mr. Duensing said the current arena management agreement expires June 30, 2017, and
the city has the right to change who the manager is effective July 1, 2016. An RFP was
issued and AEG Facilities was awarded the bid. Staff is currently in contract
negotiations with AEG Facilities. Mr. Duensing introduced Chuck Steedman, Chief
Operating Office, AEG Facilities, Matt Bettenhausen, Chief Security Officer, AEG
Facilities, and Eric Bresler, Vice President, Content Development,AEG Facilities.
Mr. Steedman said he has developed a tremendous working relationship with executive
city staff and have worked to streamline the negotiation process. He provided a brief
history of his company and played a short video about the company. He explained AEG
intends to form a partnership with the city, and said they are the world's second largest
concert promoter, the largest owner of sports teams in the world and the number one
manager, owner and operator of venues around the globe. They operate on five
continents. AEG develops real estate and invests in the areas surrounding their facilities.
He provided information on the venues they manage around the world and in the United
States. Mr. Steedman said they run their business on a guest first approach to make
sure the guest has the best experience possible.
Mr. Bettenhausen provided a short background on his experience in the security industry.
He said safety and security for guests is a priority. He said they partnered with the
Disney Institute to create the AEG Encore Program. He said they want to make sure the
guests have a good time. AEG offers a SAFE program which focuses on
counterterrorism. AEG partners with security agencies around the world, including the
FBI and Interpol. They work with the NHL not only as a team owner, but within their
security standards to make sure they have all the best practices.
Mr. Steedman said safety and security is a critical aspect of the services they provide.
AEG also has corporate sponsorships group which exists within AEG. He said they
solely exist to generate revenue for the venues within the AEG family. He said there is
nothing more important than content. He said AEG has global impact on driving content.
He said they work with many of the leading facilities in the world and have the ability to
impact how music tours at its source. He said AEG is headquartered in Los Angeles
and so are the music industry and this partnership works perfectly, giving AEG a
dominant position in the entertainment world.
Mr. Bresler said their commitment to content is what AEG is all about. AEG has direct
contact with agents, promoters and managers and works with all of them in terms of
content for their venues. He said their goal is to get the show. Event Connect is their
City of Glendale Page 11 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
program for content development. He said their goal is to have events come to Glendale
to play at Gila River Arena, and conversations have already commenced to have events
come to Glendale. He said AEG has relationships with many influential show promoters
to secure events.
Mr. Steedman said his staff will do whatever it takes to drive content to Gila River Arena.
He said they also work on promoting many sports events from UFC, professional bull
riding and basketball. AEG wants to work with Westgate and understands the
importance of a vibrant entertainment center, and will work to create events for the whole
area. He said everything they do is to create a financial return. He said they will be open
and transparent with the city regarding venue operation. He closed with another short
video about their company. He said they are proud to work with Glendale.
Councilmember Malnar said he has heard from constituents that concerts are on a
decline and wanted that issued addressed.
Mr. Steedman said the live music industry is cyclical, but that is based on an annual
calendar, not long term downturns in the industry. He said artists make money from
touring, rather than putting out records. He said although there has been a small
downturn at the beginning of this year, there are a number of acts that will be touring later
in the year. Those include older acts as well as emerging artists.
Mr. Bresler said there are many venues artists have to choose from. They start off in
rooms or clubs, but eventually end up in the arenas. He said the business has never
been stronger, and some acts will take time to get to play in an arena setting. The
business is thriving and people still enjoy going to see live music.
Mr. Steedman said AEG is committed to driving content and finding acts to fill the
venues.
Mr. Bresler said they are also seeing more festivals as well as stadium tours.
Councilmember Turner said this is a major issue for the City and citizens will be
well-served by bringing in a world class business. He said sports are significant, but
entertainment is where the future is.
Mr. Bresler said he has been here before and knows the passion the Councilmembers
have for the community.
Councilmember Aldama asked how AEG secures the acts to appear at their venues.
Mr. Steedman said promoters make deals with bands for national, multi-national or global
touring rights. He said AEG's content development team works directly with managers
and agents to determine how tours are routed. He said they will work with all the
promoters and don't rely solely on one promoter to obtain entertainment.
Councilmember Tolmachoff asked what potential AEG sees in the Gila River Arena.
Mr. Steedman said his first goal is to get the Arena back on the entertainment map and
to move it up to the most sought after venue. He said they have to let the world know
that Glendale is open for business. He said the Arena provides an opportunity to deliver a
large gross. He said their marketing team help the promoter sell tickets.
Councilmember Tolmachoff said artists have been doing multiple performances at one
City of Glendale Page 12 Printed on 4/22/2016
City Council Workshop Meeting Minutes-Final April 5,2016
venue and asks how that would work with the Arena.
Mr, Steedman said artists will do whatever the market dictates. He said this is
somewhat demand driven and if the artist thinks they can do multiple shows at a venue,
they will do it.
Councilmember Chavira asked what attracted AEG to Glendale and Gila River Arena.
Mr. Steedman said AEG has already been in Glendale to provide non-sports content to
the building. He said it is a big, really nice building. He said the Valley is a grea
market. He said acts want to play here and sponsors want to work here.
Councilmember Chavira spoke about boxing events and asked if there was resurgence in
boxing.
Mr. Steedman said that there has been an upswing in interest in boxing, which initially
started by riding the coattails of UFC. He said there has also been a resurgence of
boxing on the local level.
Councilmember Chavira asked if they see boxing taking off in Glendale with the
relationships built by AEG.
Mr. Steedman said it is content and having the doors open, lights on and seats filled is
the best thing for the Arena.
Councilmember Chavira and Mr. Steedman had further conversation about boxing.
Mayor Weiers said they were going into Executive Session and AEG would be meeting
with Council in the Executive Session.
Mr. Phelps said AEG will not be meeting with them in the Executive Session. He said
two consultants with Beacon will be there, He said he sat through the interviews with the
three firms and hoped the Councilmembers saw how clear a decision it was to choose
AEG, He said the Arena has never had the quality of management that AEG can bring to
the table. He explained their nommitnenL, resources and track record are beyond what
Glendale has ever seen
Mayor Welers thanked AEG for their presentation
CITY MANAGER'S REPORT
City Manager Phelps had nothing to report.
CITY ATTORNEY'S REPORT
City Attorney Bailey had nothing to report.
COUNCYlITEMS OF SPECIAL INTEREST
Councilmember Chavira called for staff to put together a workshop about the city's travel
pn|icieu, and how it compares to other cities. He thanked his wife for all she does. He
encouraged everyone to be nice,
City of Glendale Page 13 Printed on 4/22/2018
City Council Workshop Meeting Minutes-Final April 5,2016
EXECUTIVE SESSION
The City Council entered into Executive Session at 4:54 p.m.
A motion was made by Councilmember Aldama,seconded by Councilmember
Tolmachoff,to enter into Executive Session.The motion carried by the following
vote:
Aye: 7- Mayor Weiers, Vice Mayor Hugh, Councilmember Aldama, Councilmember Chavira,
Councilmember Malnar, Councilmember Tolmachoff, and Councilmember Turner
ADJOURNMENT
The City Council adjourned at 6:24 p.m.
City of Glendale Page 14 Printed on 4/22/2016